first row, from left to right: Juan Francisco Alonso (REE), George Ashikalis (Cyprus TSO), Mihai Paun (Med-TSO), Mehmet Kara (TEIAS), Aziz Ameyoud (OS), Carlo Sabelli (TERNA), Emmanuel Bué (RTE), Wided...
Regulation solutions among TSOs and countries
Juan Francisco Alonso Llorente, REE SpainHow is Med-TSO going to plan the agreement between its solutions, TSOs, countries and consumers?We asked it to Juan Francisco Alonso Llorente, REE Spain, Chairman...
Workshop on “Renewable Energy Development and Integration in the Mediterranean Region” – Algiers, October, 24th-25th
Opening session speechs: from left to right, Emmanuel Bué (RTE), Dario Chello (Medener), Jorge Borrego (UfM), Cyril Dewaleyne (EU), Rabah Touileb (SONELGAZ) and Angelo Ferrante (Med-TSO)A workshop on “Development and...
Press release Workshop “Renewable Energy Development and Integration in the Mediterranean Region”
Download192 KB
Four visions to plan the future interoperability grids.
Emanuel Bué (RTE – France)Interoperability between grids means interconnections between power generation and grids but also have an idea about how these interconnections could evolve. This is the support of...
Cross-border exchanges of electrical energy: results in Algiers in October
Rabah Touileb (Sonelgaz, Algeria)“Development and integration of Renewable Energies in the Mediterranean region” is the Med-TSO workshop organized by the Technical Committee “International exchanges of electricity” and the Work Group...
Workshop “Renewable Energy Development and Integration in the Mediterranean Region”
Workshop "Renewable Energy Development and Integration in the Mediterranean Region"Med-TSO's Technical Committee “International Electricity Exchanges” and Working Group “Economic Studies and Scenarios” organize the Workshop on “Renewable Energy Development and...
REE: Technological innovation projects for the stability of isolated electricity systems
A line of Red Electrica de España Red Eléctrica is spearheading a major effort to have efficient elements and that can provide a swift response in order to help maintain...
Terna: “Restarting” the power grid
Terna: "Restarting" the power grid Last April, Terna, the Italian power grid operator, conducted a "restart" test on more than 1,400 km of high-voltage power lines, from the city of...
Mediterranean Project, the point after two years since launch
From left to right: Carlo Sabelli, Juan Francisco Alonso Llorente, Rabah Touileb Three technical committees in Rome make the point on the actions to be undertaken and what has been...